Reconstruction of the BUILDING MDMO P/R A. GRADSKY
CUSTOMER
JSC "Mosproyekt-2". M. V. PosokhinADDRESS
Moscow, st. Cowhide shaft, 3, s.1
The functional purpose:
- THEATRE
The existing building being completed from the outside to the height of the existing ridge of the facade (18.5 m) and to the right of the main building added a volume with a height under the eaves of a building by 11.66 m from the planning point of the earth. The existing layout of the rooms, foyer and the auditorium remains in the layout of the theatre The main entrance to the theater is saved.
On the 1st floor there is the lobby, from which an open staircase leads to the ground floor where are located: cash lobby and distribution, foyer, dressing rooms, bathrooms, and the passage from the foyer with walk-in closets in the ground level auditorium. Also in the foyer-closet accessed by two open stairways from the main lobby-the lobby, which is located on the 1st floor. To the left of the lobby-cloakroom there are utility room, cold storage and loading of catering, underground Parking for 13 cars, a utility room, ventilation chambers, Central heating, sprinkler, pump.
The technological facilities to service the stage of the hall are to the left of the auditorium
The specialists of «OPB» performed the following work:
- Development of the design documentation section “Fire Safety Measures” (FSM);
- Development of the special technical requirements (STR) for design and construction in terms of ensuring fire safety;
- Development of design and working documentation for fire protection systems;
